A framework for conceptualizing integrated prescriptive maintenance and production planning and control models
Goal: This study aims to support researchers and managers in conceptualising new integrated prescriptive maintenance (PxM) and production planning and control (PPC) models. Design / Methodology / Approach: We perform a systematic literature review based on Thomé et al. (2016) and analyse literary...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Associação Brasileira de Engenharia de Produção (ABEPRO)
2024-09-01
|
Series: | Brazilian Journal of Operations & Production Management |
Subjects: | |
Online Access: | https://www.bjopm.org.br/bjopm/article/view/2172 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1823861024667729920 |
---|---|
author | Kevin Wesendrup Bernd Hellingrath Zoi Nikolarakis |
author_facet | Kevin Wesendrup Bernd Hellingrath Zoi Nikolarakis |
author_sort | Kevin Wesendrup |
collection | DOAJ |
description |
Goal: This study aims to support researchers and managers in conceptualising new integrated prescriptive maintenance (PxM) and production planning and control (PPC) models.
Design / Methodology / Approach: We perform a systematic literature review based on Thomé et al. (2016) and analyse literary findings using qualitative content analysis and quantitative correlation analyses.
Results: This work identifies 94 integrated PxM and PPC planning models and 47 outcomes, 16 decision variables and 34 environment entities. Based on the quantitative analyses of these components, we derive a normative framework to guide researchers and practitioners in conceptualising integrated models.
Limitations of the investigation: The study is limited to only one scientific database. Additionally, the quantitative analyses might be sensitive due to a low sample size for some components, and we only measure the linear dependency between two components. Lastly, we do not address solution algorithms.
Practical implications: The framework constitutes a tool for managers to construct integrated models tailored to their specific planning problems, fostering alignment between production and maintenance departments, plans and controls.
Originality / Value: We provide a descriptive overview and normative guidance in the selection of components that can or should be used for future PxM-aligned PPC planning studies, pinpointing possible research gaps.
|
format | Article |
id | doaj-art-51d50d158a7a46208c9e5d79c0a6e082 |
institution | Kabale University |
issn | 2237-8960 |
language | English |
publishDate | 2024-09-01 |
publisher | Associação Brasileira de Engenharia de Produção (ABEPRO) |
record_format | Article |
series | Brazilian Journal of Operations & Production Management |
spelling | doaj-art-51d50d158a7a46208c9e5d79c0a6e0822025-02-10T05:21:37ZengAssociação Brasileira de Engenharia de Produção (ABEPRO)Brazilian Journal of Operations & Production Management2237-89602024-09-0121310.14488/BJOPM.2172.2024A framework for conceptualizing integrated prescriptive maintenance and production planning and control modelsKevin Wesendrup0Bernd Hellingrath1Zoi Nikolarakis2University of Münster, Münster, Germany.University of Münster, Germany.University of Münster, Münster, Germany. Goal: This study aims to support researchers and managers in conceptualising new integrated prescriptive maintenance (PxM) and production planning and control (PPC) models. Design / Methodology / Approach: We perform a systematic literature review based on Thomé et al. (2016) and analyse literary findings using qualitative content analysis and quantitative correlation analyses. Results: This work identifies 94 integrated PxM and PPC planning models and 47 outcomes, 16 decision variables and 34 environment entities. Based on the quantitative analyses of these components, we derive a normative framework to guide researchers and practitioners in conceptualising integrated models. Limitations of the investigation: The study is limited to only one scientific database. Additionally, the quantitative analyses might be sensitive due to a low sample size for some components, and we only measure the linear dependency between two components. Lastly, we do not address solution algorithms. Practical implications: The framework constitutes a tool for managers to construct integrated models tailored to their specific planning problems, fostering alignment between production and maintenance departments, plans and controls. Originality / Value: We provide a descriptive overview and normative guidance in the selection of components that can or should be used for future PxM-aligned PPC planning studies, pinpointing possible research gaps. https://www.bjopm.org.br/bjopm/article/view/2172Prescriptive maintenanceProduction planning and controlCondition-based maintenanceModellingReview |
spellingShingle | Kevin Wesendrup Bernd Hellingrath Zoi Nikolarakis A framework for conceptualizing integrated prescriptive maintenance and production planning and control models Brazilian Journal of Operations & Production Management Prescriptive maintenance Production planning and control Condition-based maintenance Modelling Review |
title | A framework for conceptualizing integrated prescriptive maintenance and production planning and control models |
title_full | A framework for conceptualizing integrated prescriptive maintenance and production planning and control models |
title_fullStr | A framework for conceptualizing integrated prescriptive maintenance and production planning and control models |
title_full_unstemmed | A framework for conceptualizing integrated prescriptive maintenance and production planning and control models |
title_short | A framework for conceptualizing integrated prescriptive maintenance and production planning and control models |
title_sort | framework for conceptualizing integrated prescriptive maintenance and production planning and control models |
topic | Prescriptive maintenance Production planning and control Condition-based maintenance Modelling Review |
url | https://www.bjopm.org.br/bjopm/article/view/2172 |
work_keys_str_mv | AT kevinwesendrup aframeworkforconceptualizingintegratedprescriptivemaintenanceandproductionplanningandcontrolmodels AT berndhellingrath aframeworkforconceptualizingintegratedprescriptivemaintenanceandproductionplanningandcontrolmodels AT zoinikolarakis aframeworkforconceptualizingintegratedprescriptivemaintenanceandproductionplanningandcontrolmodels AT kevinwesendrup frameworkforconceptualizingintegratedprescriptivemaintenanceandproductionplanningandcontrolmodels AT berndhellingrath frameworkforconceptualizingintegratedprescriptivemaintenanceandproductionplanningandcontrolmodels AT zoinikolarakis frameworkforconceptualizingintegratedprescriptivemaintenanceandproductionplanningandcontrolmodels |