ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION

This research work presents the reliability assessment of electrical load distribution system in Federal University of Petroleum Resources, Effurun (FUPRE), Warri using the Analytical method and ETAP software as the simulation tool to run the reliability assessment of the System. The analytical ana...

Full description

Saved in:
Bibliographic Details
Main Authors: AMAKIRI OKILO FRIDAY, OSHEVIRE PATRICK
Format: Article
Language:English
Published: Alma Mater Publishing House "Vasile Alecsandri" University of Bacau 2020-07-01
Series:Journal of Engineering Studies and Research
Subjects:
Online Access:https://jesr.ub.ro/index.php/1/article/view/205
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1823863627631820800
author AMAKIRI OKILO FRIDAY
OSHEVIRE PATRICK
author_facet AMAKIRI OKILO FRIDAY
OSHEVIRE PATRICK
author_sort AMAKIRI OKILO FRIDAY
collection DOAJ
description This research work presents the reliability assessment of electrical load distribution system in Federal University of Petroleum Resources, Effurun (FUPRE), Warri using the Analytical method and ETAP software as the simulation tool to run the reliability assessment of the System. The analytical analysis was conceded out by using August 2018 – August 2019 historical data of Tetfund Classrooms Blocks, Hostels, College of Technology, Administration Block, Health Center, and College of Science Feeder obtained from the Benin Electricity Distribution Company [BEDC]. The results conceded revealed that College of Technology Injection Substation is the most reliable in the distribution network when compared to the other five substations around the institution premises as it recorded system indices of ASAI: 99.30, SAIFI: 1.10, SAIDI: 55.35, CAIDI: 123.04 in August 2018 to August 2019. Nevertheless, the total reliability indices of the six substations under investigation as obtained from the analysis, and it shows that availability of power to FUPRE distribution is very poor as compared with the benchmark of IEEE ASAI of 99.99 for distribution substation availability.
format Article
id doaj-art-b8f5e65996e448c99784f0d5f6995d45
institution Kabale University
issn 2068-7559
2344-4932
language English
publishDate 2020-07-01
publisher Alma Mater Publishing House "Vasile Alecsandri" University of Bacau
record_format Article
series Journal of Engineering Studies and Research
spelling doaj-art-b8f5e65996e448c99784f0d5f6995d452025-02-09T11:37:36ZengAlma Mater Publishing House "Vasile Alecsandri" University of BacauJournal of Engineering Studies and Research2068-75592344-49322020-07-01263ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATIONAMAKIRI OKILO FRIDAYOSHEVIRE PATRICK This research work presents the reliability assessment of electrical load distribution system in Federal University of Petroleum Resources, Effurun (FUPRE), Warri using the Analytical method and ETAP software as the simulation tool to run the reliability assessment of the System. The analytical analysis was conceded out by using August 2018 – August 2019 historical data of Tetfund Classrooms Blocks, Hostels, College of Technology, Administration Block, Health Center, and College of Science Feeder obtained from the Benin Electricity Distribution Company [BEDC]. The results conceded revealed that College of Technology Injection Substation is the most reliable in the distribution network when compared to the other five substations around the institution premises as it recorded system indices of ASAI: 99.30, SAIFI: 1.10, SAIDI: 55.35, CAIDI: 123.04 in August 2018 to August 2019. Nevertheless, the total reliability indices of the six substations under investigation as obtained from the analysis, and it shows that availability of power to FUPRE distribution is very poor as compared with the benchmark of IEEE ASAI of 99.99 for distribution substation availability. https://jesr.ub.ro/index.php/1/article/view/205reliability assessment, availability of power, distribution system, reliability indices, load point indices, system indices and ETAP
spellingShingle AMAKIRI OKILO FRIDAY
OSHEVIRE PATRICK
ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
Journal of Engineering Studies and Research
reliability assessment, availability of power, distribution system, reliability indices, load point indices, system indices and ETAP
title ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_full ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_fullStr ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_full_unstemmed ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_short ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_sort electrical load reliability assessment using analytical method case study fupre 1 x 2 5mva injection substation
topic reliability assessment, availability of power, distribution system, reliability indices, load point indices, system indices and ETAP
url https://jesr.ub.ro/index.php/1/article/view/205
work_keys_str_mv AT amakiriokilofriday electricalloadreliabilityassessmentusinganalyticalmethodcasestudyfupre1x25mvainjectionsubstation
AT oshevirepatrick electricalloadreliabilityassessmentusinganalyticalmethodcasestudyfupre1x25mvainjectionsubstation