Redesigning and Improvement of the 5MVA 33/11kv Kabale Distribution Substation for Electricity Supply Reliability.
In the near future, Kabale Municipality is becoming a city, awaiting industry growth and growth in number of electricity consumers. In order to occur a continues supply of power to the consumers in the region, it was decided to redesign the existing 5MVA 33/1 l kV substation, to solve power supply...
Saved in:
Main Author: | Kato, James Ssekitoleko |
---|---|
Format: | Thesis |
Published: |
Kabale University
2023
|
Online Access: | http://hdl.handle.net/20.500.12493/1247 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
by: AMAKIRI OKILO FRIDAY, et al.
Published: (2020-07-01) -
EVALUATION SUBSTATION PROTECTION SYSTEM FROM LIGHTNING STRIKES AT 150KV JATIGEDE SUBSTATION
by: Taryo Taryo, et al.
Published: (2025-01-01) -
ACCIDENTS AND OCCUPATIONAL ILLNESS ASSESSMENTS FOR 400/220/110/20 kV URECHESTI POWER SUBSTATION
by: Nicolae Daniel FÎȚĂ, et al.
Published: (2023-12-01) -
ASSESSMENT OF THE LEVEL OF SAFETY AND HEALTH AT WORK OF THE 400/220/110/20 kV MINTIA POWER SUBSTATION
by: Nicolae Daniel FÎȚĂ, et al.
Published: (2023-12-01) -
Post-evaluation model for 500 kV substation engineering projects using the fuzzy comprehensive evaluation method
by: Jianquan Chen, et al.
Published: (2025-02-01)